Ostrava tram line 1
OperationalCity: Ostrava (Czech Republic).
Route length: 11.8 km (7.3 miles).
Driving time: 31 min.
Track gauge: 1435 mm (standard gauge).
Opened: May 1, 1901.
The line is operated by
Dopravní podnik Ostrava (DPO)
Operational
Lines in Ostrava
Select line type: Tram lines, extra lines, night lines, and party lines.
Tram lines in Ostrava
Ostrava tram line 1
Operational
Ostrava tram line 2
Operational
Ostrava tram line 3
Operational
Ostrava tram line 4
Operational
Ostrava tram line 5
Operational
Ostrava tram line 6
Operational
Ostrava tram line 7
Operational
Ostrava tram line 8
Operational
Ostrava tram line 11
Operational
Ostrava tram line 12
Operational
Ostrava tram line 15
Operational
Ostrava tram line 17
Operational
Ostrava tram line 9
Closed
Ostrava tram line 13
Closed
Ostrava tram line 1 stops
Hlavní nádraží, and Dubina.
Photos and videos of Ostrava tram line 1

July 15, 2015.