Heidelberg Bergbahn
OperationalCity: Heidelberg (Germany).
Route length: 1.5 km (0.9 miles).
Driving time: 17 min.
Track gauge: 1000 mm (metre gauge).
Opened: 1890.
Closed: November 2, 2020 because of COVID-19.
Reopened: November 2, 2021.
The line is operated by
Rhein-Neckar-Verkehr in Heidelberg (RNV)
Operational
Lines in Heidelberg
Select line type: Tram lines, extra lines, extra regional lines, funiculars, and restaurant lines.
Funiculars in Heidelberg
Heidelberg Bergbahn
Operational
Heidelberg Bergbahn stops
Kornmarkt, Königstuhl, Molkenkur, and Schloss.
View the route map in high resolution.
Photos and videos of Heidelberg Bergbahn
Heidelberg Bergbahn with railcar Königstuhlbahn 3 at Molkenkur (2009)By Henrik Boye.
October 13, 2009.
October 13, 2009.
Heidelberg Bergbahn with railcar Königstuhlbahn 4 (2009)By Henrik Boye.
October 13, 2009.
October 13, 2009.
Heidelberg Bergbahn with railcar Molkenbahn 2 at Molkenkur (2009)By Henrik Boye.
October 13, 2009.
October 13, 2009.
Postcard: Heidelberg Bergbahn with railcar Molkenbahn 2 near Schloss (2004)By Henrik Boye, Verlag Johannes Oefner.
2004.
2004.
Heidelberg Bergbahn with railcar Königstuhlbahn 4 at Königstuhl (2001)By Henrik Boye.
February 2001.
February 2001.
Heidelberg Bergbahn with railcar Bergbahn 1 at Schloss (1998)By Henrik Boye.
April 9, 1998.
April 9, 1998.
Heidelberg Bergbahn with railcar Bergbahn 2 at Schloss (1998)By Henrik Boye.
April 9, 1998.
April 9, 1998.
Postcard: Heidelberg Bergbahn with railcar Bergbahn 2 near Schloss (1998)By Henrik Boye, Kunstverlag Gärtner-Schäfer.
1998.
1998.