Halberstadt extra line 1: Friedhof - Hauptbahnhof
OperationalCity: Halberstadt (Germany).
Route length: 3.7 km (2.3 miles).
Driving time: 14 min.
Track gauge: 1000 mm (metre gauge).
Opened: May 2, 1903.
The line is operated by
Halberstädter Verkehrs (HVG)
Operational
Lines in Halberstadt
Select line type: Tram lines, extra lines, and museum lines.
Extra lines in Halberstadt
Halberstadt extra line 1: Friedhof - Hauptbahnhof
Operational
Halberstadt extra line 1: Friedhof - Hauptbahnhof stops
View the route map in high resolution.
Photos and videos of Halberstadt extra line 1: Friedhof - Hauptbahnhof
[Doku] Straßenbahn Halberstadt (2019)By Modellbahnwelt TV.
August 16, 2019.
August 16, 2019.
Straßenbahn Halberstadt linia 2By esbek2.
July 22, 2016.
July 22, 2016.
Straßenbahn Halberstadt linia 1By esbek2.
July 12, 2016.
July 12, 2016.
Straßenbahn Halberstadt 2014By tramfreak2000.
July 22, 2014.
July 22, 2014.
Straßenbahn Halberstadt - Freundeskreis für Linie 1 - November 2012By pouchklepper.
November 25, 2012.
November 25, 2012.
125 Jahre Straßenbahn in HalberstadtBy EEPSpieler.
July 1, 2012.
July 1, 2012.
Führerstandmitfahrt tram in Halberstadt. tram cabrideBy tram-TV.
January 4, 2012.
January 4, 2012.
Die Straßenbahn in HalberstadtBy KT4Dani.
September 23, 2011.
September 23, 2011.
Halberstadt extra line 1 with articulated tram 161 at Friedhof (2001)By Henrik Boye.
August 1, 2001.
August 1, 2001.
Halberstadt extra line 1 with articulated tram 165 at Hauptbahnhof (2001)By Henrik Boye.
August 1, 2001.
August 1, 2001.
Die Straßenbahn von Halberstadt (1993) mit Gotha Wagen und ex StuttgarternBy Tram Aktuell.
1993.
1993.