Brussels extra line 32: Da Vinci - Drogenbos Château / Kasteel
OperationalCity: Brussels (Belgium).
Route length: 15.9 km (9.9 miles).
Driving time: 51 min.
Track gauge: 1435 mm (standard gauge).
Reopened: September 1, 2007.
The line is operated by
Brussels Intercommunal Transport Company (MIVB/STIB)
Operational
Lines in Brussels
Select line type: Tram lines, extra lines, museum lines, and regional lines.
Extra lines in Brussels
Brussels extra line 32: Da Vinci - Drogenbos Château / Kasteel
Operational
Brussels extra line 31: Noordstation / Gare du Nord - Marius Renard
Closed
Brussels extra line 32: Da Vinci - Drogenbos Château / Kasteel stops
Da Vinci, Drogenbos Château / Kasteel, and Arts-Loi / Kunst-Wet.
View the route map in high resolution.
Photos and videos of Brussels extra line 32: Da Vinci - Drogenbos Château / Kasteel
Postcard: Brussels extra line 32 with railcar 7140 at Arts-Loi / Kunst-Wet (1981)By Henrik Boye, Ministere Des Communications/Ministerie Van Verkeerswezen.
1981.
1981.